Connecting To Display I/F (Cnc C70) - Mitsubishi Electric GT16 User Manual

Got1000 series
Hide thumbs Also See for GT16:
Table of Contents

Advertisement

Confirming the communication state of
Ethernet module
(1) When using the Command Prompt of Windows
Execute a Ping command at the Command Prompt of
®
Windows
.
(a) When normal communication
C:\>Ping 192.168.0.19
Reply from 192.168.0.19: bytes=32 time<1ms
TTL=64
(b) When abnormal communication
C:\>Ping 192.168.0.19
Request timed out.
(2) When abnormal communication
At abnormal communication, check the followings and
execute the Ping command again.
• Mounting condition of Ethernet communication unit
• Cable connecting condition
• Confirmation of switch and network parameter setting
• Operation state of PLC CPU (faulty or not)
• IP address of GOT specified by Ping command
22.4.13 Connecting to Display I/F
(CNC C70)
®
.
This section describes the settings of the GOT and Display I/F
(CNC C70) in the following case of the system configuration.
POINT
POINT
POINT
Display I/F (CNC C70)
For details of the Display I/F (CNC C70), refer to the
following manual.
C70 Series SET UP MANUAL
System configuration
■ Ethernet parameter settings of FX3U-ENET-L Configuration tool
IP address settings of CNC C70
(1) Remote monitor tool
Item
IP address
Subnet mask
Gateway address
Port number
Speed auto/10M
22. ETHERNET CONNECTION
[Controller Setting] and [Ethernet] of GT
Designer3
<GOT> (The settings other than the
following are set to the default)
Network No.
PLC No.
IP address
Port No.
Communication format : UDP (fixed)
<Q17nNCCPU> (The settings other than the
following are set to the default)
Network No.
: 239
PLC No.
: 2
IP address
: 192.168.0.19
Port No.
: 5001
Communication format
: UDP(fixed)
Setting necessity at
Set value
GOT connection
192.168.0.19
255.255.255.0
0.0.0.0
64758 (fixed)
0 (fixed)
: Necessary
: As necessary
: Not necessary
22.4 PLC Side Setting
20
21
22
: 1
: 1
: 192.168.0.18
: 5001
23
24
25
26
27
22 - 49

Advertisement

Table of Contents
loading

Table of Contents