Items To Be Checked Before Starting Drawing - Mitsubishi Electric GT16 User Manual

Got1000 series
Hide thumbs Also See for GT16:
Table of Contents

Advertisement

30.3.5 Items to be checked before starting drawing

The following describes that should be understood before starting drawing and the functions that should be set
beforehand when using the multi-channel function.
Device settings
It is necessary to set the device to be used together with the CH No.
GT Designer3 Version1 Screen Design Manual
Click the device setting button.
Accessible range for monitoring
The accessible range for monitoring is not changed even when the multi-channel function is used.
GOT1000Series Connection Manual (Mitsubishi Products) for GT Works3
Clock function
Set the controller for which adjust/broadcast should be executed by the CH No.
GT Designer3 Version1 Screen Design Manual
Click the controller to be set.
10:10
Broadcast is
executed for
CH No.1 and
CH No.3.
Set the device.
10:10
CH No.1
FXCPU
CH No.2
QCPU
10:10
CH No.3
ALLEN-BRADLEY PLC
CH No.4
Robot controller
30. MULTI-CHANNEL FUNCTION
30.3 GOT Side Settings
28
29
30
31
32
33
34
35
30 - 9

Advertisement

Table of Contents
loading

Table of Contents