Mitsubishi Electric GT16 User Manual page 44

Got1000 series
Hide thumbs Also See for GT16:
Table of Contents

Advertisement

1.1 Features
Display unit
The TFT color LCD with high intensity, wide viewing angle and high definition is adopted as the display unit.
Monitoring for turning ON/OFF bit devices of a PLC, forced turning ON/OFF the bit devices of a PLC, monitoring the
word device set value/current value and changing that numeric values are easily made.
(1) The display unit is used for engineers' stage replacement, setting change and troubleshooting or for
operation guidance to an operator.
• Monitor
• Forced turning ON/OFF
• Set value change
• Trouble check
(2) Improved monitoring performance and connectivity to FA devices
• Multiple languages are displayed using the Unicode2.1-compatible fonts and beautiful characters are drawn
using the TrueType and high quality fonts.
• A fine and beautiful full-color display which shows even small characters clearly, is enabled by adopting the
high intensity, wide viewing angle and high definition TFT color LCD. (Also compatible with digital screen
displays with 65536 colors, BMP, etc.)
• High speed monitoring through high speed communication at maximum of 115.2kbps.
• High speed display and high speed touch switch response.
(3) More efficient GOT operations including screen design, startup, adjustment, management and
maintenance works
• The 15MB built-in flash memory is included as standard.
• CF card interface is included as standard.
• USB interface (host/device) is included as standard.
• Ethernet interface is included as standard.
• System font types are increased by the adoption of the font installation system.
• Four types of alarms (system alarm, user alarm, alarm history and alarm popup display) are integrated, and
realizing an efficient alarm notification.
• Maintenance timing report function, which counts the backlight power-on time, etc., is available to notify the
maintenance timing.
(4) Enhanced support of FA device setup tools
• Transferring or monitoring the sequence programs using the personal computer connected to GOT is
available, during connection to A, QnA, L, Q, or FX series PLC CPU (FA Transparent function).
Operation switch
The operation switches are the mechanical keys directly connected to the input of a PLC.
The switch can be used for the inputs that require a quick response to machine such as run or stop since a command is
directly given to the PLC.
The operation switches are used as keys for operator to provide operation commands to the machine.
• Start/Stop
• Stage replacement
• Trouble removal
• Mode selection such as automatic or individual
Connection cable
A optional connection cable is required to connect the GOT to a PLC.
1 - 2
1. OVERVIEW
1.1 Features

Advertisement

Table of Contents
loading

Table of Contents