Mitsubishi Electric GT16 User Manual page 363

Got1000 series
Hide thumbs Also See for GT16:
Table of Contents

Advertisement

4.
Turning the CF card access switch off executes Core OS installation.
5.
When the installation is completed, the dialog as shown below is displayed.
(The POWER LED of the GOT blinks (green/orange) at the installation completion.)
Confirm that the message is displayed and power the GOT off.
6.
Remove the CF card after powering the GOT off.
7.
Powering the GOT on again displays the screen as shown below.
(The GOT goes to the status of factory shipment.)
Install OS (Standard monitor OS, communication driver, etc.) or download project data as required.
For how to install each OS or download project data, refer to the following manual.
GT Designer3 Version1 Screen Design Manual (Fundamentals)
16. INSTALLATION OF COREOS, BOOTOS AND STANDARD MONITOR OS
16 - 13
16.5 CoreOS
9
10
11
12
13
14
15
16

Advertisement

Table of Contents
loading

Table of Contents