Mitsubishi Electric GT16 User Manual page 173

Got1000 series
Hide thumbs Also See for GT16:
Table of Contents

Advertisement

(3) Operating priority guaranteed time
POINT
POINT
POINT
Relation between the authorization obtained time and the operating priority guaranteed time
When the followings are set, the authorization obtained time is prioritized. (After the authorization obtained time is
elapsed, the GOT automatically obtains the authorization.)
• 1sec or more is set for the authorization obtained time.
• The authorization guarantee time is set longer than the authorization obtained time.
(4) Operation status popup notification
1.
Touch the operating priority guaranteed time
display area to display a keyboard.
Enter the operating priority guaranteed time with
the keyboard.
2.
If touch the [OK] button, the changed settings are
reflected and the screen returns to the [Operation]
screen.
If touch the [Cancel] button, the changed settings
are canceled and the screen returns to the
[Operation] screen.
3.
In the [Operation] screen, touching the [OK]/
[Cancel]/
with the changed settings.
1.
Setting item is changed if setting item is touched.
2.
If touch the [OK] button, the changed settings are
reflected and the screen returns to the [Operation]
screen.
If touch the [Cancel] button, the changed settings
are canceled and the screen returns to the
[Operation] screen.
3.
In the [Operation] screen, touching the [OK]/
[Cancel]/
with the changed settings.
11. DISPLAY AND OPERATION SETTINGS (GOT SET UP)
11.3 Operation Settings (Settings Regarding Operation)
button restarts and operates the GOT
(YES
NO)
button restarts and operates the GOT
9
10
11
12
13
14
15
16
11 - 31

Advertisement

Table of Contents
loading

Table of Contents