Inspections And Confirmations Before Trial Operation - YASKAWA SGD7S-1R9D Product Manual

Table of Contents

Advertisement

7.2 Inspections and Confirmations before Trial Operation

7.2

Inspections and Confirmations before Trial Operation

To ensure safe and correct trial operation, check the following items before you start trial oper-
ation.
• Make sure that the SERVOPACK and Servomotor are installed, wired, and connected cor-
rectly.
• Make sure that the correct power supply voltage is supplied to the SERVOPACK.
• Make sure that there are no loose parts in the Servomotor mounting.
• If you are using a Servomotor with an Oil Seal, make sure that the oil seal is not damaged.
Also make sure that oil has been applied.
• If you are performing trial operation on a Servomotor that has been stored for a long period of
time, make sure that all Servomotor inspection and maintenance procedures have been com-
pleted.
Refer to the manual for your Servomotor for Servomotor maintenance and inspection infor-
mation.
• If you are using a Servomotor with a Holding Brake, make sure that the brake is released in
advance. To release the brake, you must apply the specified voltage of 24 VDC to the brake.
A circuit example for trial operation is provided below.
Power supply
7-6
SERVOPACK
L1
L2
L3
24 V
PE
AC/DC
0 V
24-V power supply or brake power supply
AC DC
Servomotor with
a Holding Brake
U
V
M
W
ENC
CN2
BK
24 VDC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents