Inspections and Confirmations before Trial Operation

To ensure safe and correct trial operation, check the following items before you start trial oper-
ation.
• Make sure that the SERVOPACK and Servomotor are installed, wired, and connected cor-
rectly.
• Make sure that the correct power supply voltage is supplied to the SERVOPACK.
• Make sure that there are no loose parts in the Servomotor mounting.
• If you are performing trial operation on a Servomotor that has been stored for a long period of
time, make sure that all Servomotor inspection and maintenance procedures have been com-
pleted.