Installation
2. Setting Up the Equipment
2.
Setting Up the Equipment
2.1
Tools
• Phillips head screwdriver No. 2
2.2
Unpacking
CAUTION
During unloading, carrying-in and unpacking, take care to:
• Avoid shock and vibration.
Strong shock or vibration during unloading or moving equipment can cause
damage or faulty operation.
• Avoid abrupt changes in temperature.
Abrupt changes in temperature during unloading or moving equipment
can cause condensation inside of the equipment. Allow condensation to
dry and disappear by waiting for at least one hour before turning on the
power. This will prevent the possibility of faulty operation.
Unpacking Procedure
Control unit
(1)
Open the carton.
(2)
Take out the accessories box.
(3)
Remove the packaging material, then take out the control unit, keyboard,
mouse, and accessories.
Monitor
(1)
Open the carton and take out the accessories.
(2)
Remove the packaging material, then take out the monitor.
Other
(1)
Take out the printer interface board and printer interface cable from the box.
006-251-01
05.12.99 FM2442
Installation-8
FN-PS551 Service Manual Installation-8