5 Repair
5.6.5 Replacing the axis-5 joint unit and the axis-5 to axis-6 transition cabling
Continued
2
3
4
Continues on next page
574
Action
Connect the connectors to each other and snap
them to the cable holders.
J7.CS to J7.CS
J7.CP to J7.CP
Secure the cables for functional earth and protect-
ive earth with a screw.
Secure the cabling with cable ties.
© Copyright 2021 ABB. All rights reserved.
Note
xx2000002163
Hex socket head cap screw: M3x6
(1 pcs).
Tightening torque: 0.8 Nm.
xx2000002162
Cable ties (3 pcs)
xx2000002161
Product manual - CRB 15000
3HAC077389-001 Revision: A