ABB CRB 15000 Product Manual page 209

Hide thumbs Also See for CRB 15000:
Table of Contents

Advertisement

5
Refitting the axis-4 cover
1
2
Product manual - CRB 15000
3HAC077389-001 Revision: A
Action
Secure the cabling with cable ties.
Action
Fit the o-ring to its groove.
Replace if damaged.
Place the cover at mounting position and recon-
nect the brake release connector DR.X8 to the
drive board.
© Copyright 2021 ABB. All rights reserved.
5.3.6 Replacing the axis-5 cabling
Note
Cable ties (3 pcs)
xx2000002086
xx2000002124
Note
O-ring: 3HAC061327-051
xx2000002092
Tweezers
xx2000002085
Continues on next page
5 Repair
Continued
209

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents