Migrating a DEFINITY Server R to an S8700-Series Media Server
On site migration checklist
When you are on site, complete the following tasks before you start the migration:
Task
Verify that the EIA 310D
19-inch (48-cm) open
equipment rack is grounded.
For S8710 only:
Verify that the open,
customer-supplied, EIA
310D (or equivalent)
standard 4-post, 19-inch
(48-centimeter), equipment
rack is properly installed
and solidly secured.
Verify that you have the
correct cables for the
TN2312BP Internet Protocol
Server Interface (IPSI)
circuit packs.
Verify that you have all
necessary equipment
onsite.
752 Upgrading, Migrating, and Converting Media Servers and Gateways
Description
See the job aid titled Approved Grounds
(555-245-772).
Ensure that you have the screws that come with the
rack. Ensure that the rail kit for the Avaya-supplied
UPS is installed on the rack or available for
installation. For more information on installing the rail,
see the rail kit documentation.
The cables must be labeled and run from the control
hardware rack to the port networks. Appropriate
connectivity must be provided.
For the list of required hardware, see:
Installing and Configuring the Avaya S8500
Media Server (03-300143)
Installing and Configuring the Avaya
S8700-Series Media Server (03-300145)