Avaya S8100 Series Manual page 1136

Media servers and gateways
Hide thumbs Also See for S8100 Series:
Table of Contents

Advertisement

Converting some or all ATM port networks to IP-PNC
3. In the Primary field, enter a synchronization-source circuit pack location. Obtain this
location from the "Circuit Packs Available for Synchronization" list. Ensure that you choose
a working synchronization source.
In the example, location 03B20 is the primary synchronization source for PN 4.
4. Optionally, add another synchronization-source circuit pack location in the Secondary field.
Obtain the location from the "Circuit Packs Available for Synchronization" list.
5. Press Submit.
6. Wait about 5 minutes for Communications Manager to update the synchronization plan.
Then to check the changes, enter list synchronization and the status
synchronization commands.
7. If the Switching Capability field for this PN is disabled on the Synchronization Status
screen, enter enable synchronization-switch all.
8. To check for errors, enter test synchronization port-network n long. All listed
ports must show PASS in the Results field. If the Results field does not show PASS, you
must troubleshoot the synchronization error.
Post-conversion tasks
You must complete the following tasks after you complete the conversion tasks.
Connecting to the active media server
If you are on site, connect to the services port on the back of the active media server.
If you are off site, log on to the active media server with the actual IP address of the media
server.
Enabling scheduled maintenance with SAT
To enable scheduled maintenance.
1. Type change system-parameters maintenance and press Enter.
2. Ensure that the administration for the Start Time and Stop Time fields is the same as
before the upgrade.
1136 Upgrading, Migrating, and Converting Media Servers and Gateways

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents