Setting IPSI duplication (high-reliability critical-reliability only)
●
Setting the alarm activation level
●
Backing up translations
●
Verifying hardware
●
Changing the control cabinet to a port network
●
Turning off the power to the control cabinet
●
Replacing the processor circuit pack
●
Replacing the TN799C C-LAN circuit pack
●
Installing TN771 Maintenance/Test circuit pack
●
Connecting to the media server
●
Post-migration administration:
Accessing the server command line interface with SSH protocol
●
Using static addressing
●
Clearing the ARP cache on the laptop computer
●
Logging in to the IPSI
●
Setting the control interface
●
Setting the VLAN and diffserv parameters
●
Resetting the IPSI
●
Verifying IPSI translations
●
Verifying IPSI connectivity
●
Enabling control of the IPSI
●
Verifying the customer data
●
Verifying circuit pack locations
●
Verifying circuit pack insertion
●
Verifying the IP addresses
●
Checking the link status
●
Upgrading firmware
●
Testing the installation
●
Busying out previously busied out trunks
●
Troubleshooting the migration
●
Returning replaced equipment
●
on page 818
on page 818
on page 819
on page 820
on page 822
on page 824
on page 825
on page 826
on page 827
on page 828
on page 829
on page 829
on page 829
on page 830
on page 830
on page 830
on page 831
on page 831
on page 832
on page 832
on page 832
on page 818
on page 819
on page 820
on page 821
on page 821
on page 824
on page 827
on page 832
Migration tasks
on page 822
Issue 2.1 June 2006
811