Avaya S8100 Series Manual page 533

Media servers and gateways
Hide thumbs Also See for S8100 Series:
Table of Contents

Advertisement

ICC cables from carrier A to B (if required)
- No ICC cables are required for systems with simplex reliability
AUX cable to carrier A
9-pin D subminiature plug to the P1 connector on each carrier
5. Install the faceplates on carrier A.
6. Install the power supplies in carrier A.
Installing IPSI and maintenance circuit packs
To install the IPSI and maintenance card circuit packs:
1. Remove the TN2182 Tone Clock circuit pack from the control carrier. Place the circuit pack
in an antistatic carrier or bag.
Note:
Do not remove the TN771 Maintenance/Test circuit pack if this circuit pack is
Note:
present.
2. Remove the TN775B/C Maintenance (EPN) circuit pack from the expansion control carrier.
Place the circuit pack in an antistatic carrier or bag.
3. Insert the TN2312BP Internet Protocol Server Interface (IPSI) circuit pack part way into the
TONE-CLOCK slot.
4. With the red line on the bottom, attach one end of the short ribbon cable to the connector on
the component side of the TN2312BP Internet Protocol Server Interface (IPSI) circuit pack
(Ribbon cable connector
Figure 21: Ribbon cable connector
5. Push the tabs on the ends of the connector inward to lock the connector in place.
on page 533).
caxxinst LJK 022002
Migration tasks
Issue 2.1 June 2006
533

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents