Avaya S8100 Series Manual page 1101

Media servers and gateways
Hide thumbs Also See for S8100 Series:
Table of Contents

Advertisement

2. Reseat the switch-node clock circuit pack (TN572).
3. Enter release board.
For one CSS with duplicated SN clocks:
1. Enter busyout board UUCSS, where UUCSS is the location of the standby switch-node
clock.
2. Reseat the standby switch-node clock circuit pack (TN572).
3. Enter release board.
4. Enter set switch-node clock UUCSS, where UUCSS is the location of the
currently-active standby switch-node clock. The active and the standby switch-node
clocks are now interchanged.
5. Enter busyout board UUCSS, where UUCSS is the location of the standby switch-node
clock.
6. Reseat the standby switch-node clock circuit pack.
7. Enter release board.
For more than one CSS:
1. Enter busyout pnc-standby.
2. Enter busyout board UUCSS, where UUCSS is the location of the switch-node clock in
the standby CSS.
3. Reseat the standby switch-node clock circuit pack (TN572).
4. Enter release board
5. Enter release pnc-standby.
6. Enter reset pnc interchange.
7. Repeat steps
Administering PN synchronization, if necessary
Perform this procedure if the PN that you just converted to IP-PNC requires a synchronization
source. To administer synchronization:
1. After the conversion, enter the SAT commands list synchronization and status
synchronization to show the synchronization information for the IP-PNC PNs. The
Primary and the Secondary fields on the Synchronization Plan screen and the Source
Physical Location field on the Synchronization Status screen must be empty.
2. Enter change synchronization port-network n, where n is the PN number of the
converted port network that requires synchronization.
1
through
6
for each additional CSS.
Conversion Tasks
Issue 2.1 June 2006
1101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents