Presite migration checklist
Before you go on site, complete the following tasks:
Task
Verify the voice network,
dial plan, and E911 for
remote locations were
redesigned.
Verify that all existing circuit
packs work with the new
system.
Replace any TN799B/C
C-LAN circuit packs.
Replace 259A adapter and
CAT3 cable.
Replace the TN776 and
TN570 EI circuit packs.
Before you go on site, complete the following additional tasks:
Task
Replace the TN570 EI
circuit packs.
Description
(if applicable)
Check the Minimum Vintage Table. Go to the
Hardware and Software Compatibility Matrix (ftp//
ftp.avaya.com/incoming/Up1cku9/tsoweb/media/
minhardwarevintages.pdf).
Replace with the TN799DP circuit pack.
Replace with the cable extender adapter (Comcode
848525887) and CAT5 or better cable.
Replace with TN570B, vintage 7 or later circuit packs.
Description
If coincidentally installing an ESS server, replace with
TN570D or later circuit pack.
Migration paths
Issue 2.1 June 2006
707