Avaya S8100 Series Manual page 803

Media servers and gateways
Hide thumbs Also See for S8100 Series:
Table of Contents

Advertisement

Task
Run the Automatic
Registration Tool (ART) for
the INADS IP address, if
necessary.
Verify that you copied the
necessary files to your
computer.
Additional tasks
Before you go on site for a migration from a DEFINITY system, complete the following
additional tasks before you start the migration:
Task
Verify that you have the
required, customer-provided
network information. Obtain
a completed Electronic
Preinstallation Worksheet
(EPW)
Premigration setup
The premigration team must complete the following tasks. If these tasks are not completed, do
not continue with the migration.
Some tasks need to be completed on site up to two weeks before starting the actual migration.
Freeze the translations.
Send the translations to STS.
Get the translations back from STS by e-mail.
Description
This step is necessary if the configuration of the
customer INADS alarming modem has changed or if
any changes were made to the system alarming
configuration.
ART is available only to Avaya associates.
BusinessPartners can call 800-295-0099.
These files can include:
Service packs
License file
Authentication file
Firmware for programmable circuit packs
Description
The EPW is an Excel spreadsheet that provides the
information about the network. You need this
information to configure the control network
components with the Avaya Installation Wizard. Get
the EPW from the Avaya project manager, Avaya
software technician, or customer network
administrator. A blank EPW is available at the Avaya
Installation Wizard web site
avayaiw/).
Migration paths
3 of 3
(http://support.avaya.com/
Issue 2.1 June 2006
803

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents