At the customer site
Perform the tasks in this section at the customer site.
Go to the standard documentation
Use Installing and Upgrading the Avaya G700 Media Gateway and Avaya S8300
Media Server, 555-234-100, Issue 9, February 2006.
To convert the LSP to an ICC, you complete selected tasks from Chapters 3 and 5.
You need to complete only some of the tasks in these chapters. The specific tasks
are identified by page number in the left-hand column. The subtasks to perform or
skip are listed in the right-hand column.
It is important to note where the task is performed. Most of the tasks are done on a
server or gateway — on the LSP/ICC S8300, on the primary controller for the LSP,
on a DHCP server, or on the gateway processor (MGP). The headings below
indicate on which of these devices the task is performed.
1. Administer the primary
controller to which the
LSP was formerly
assigned.
See "Administer
Communication
Manager" in Chapter
9, and remove, instead
of add, the LSP.
2. Administer the media
gateway.
See "Administering the
Media Gateway" in
Chapter 9.
Task
On the LSP's primary controller
Steps/Comments
Remove LSP node name using the
●
change node-names ip command.
Dis-associate LSP from network regions
●
using the change ip-network-region
<number> command.
Remove LSP from the LSP screen using
●
the remove survivable-processor
<node-name> command.
Repeat for every LSP to be controlled by
●
the new ICC.
Remove media gateway using the remove
●
media-gateway <number> command.
Repeat for each gateway to be controlled
●
by the converted LSP.
Introduction
Issue 2.1 June 2006
1151