Commissioning (Startdrive)
8.3 Basics
8.3.5
Loading project data into the drive
Overview
Load the data from your Startdrive project into a drive.
Requirement
• A project has been created.
• A drive has been created and completely configured in the project.
• Optional: There is an active online connection between the converter and operating unit.
• For activated user management (UMAC):
The function rights for editing and loading drive data are activated for the user account.
Details on this topic are provided in Chapter "Security settings in Startdrive" of Industrial
Cybersecurity Configuration Manual
109810578).
Procedure
Proceed as follows to load the project data into your converter:
1. Select a drive in the project tree.
2. Click the
– If you have already established an online connection, then the "Load preview" dialog
– If you have not established an online connection, then the "Extended loading" dialog
3. Check the messages in the "Load preview" dialog.
The "Save parameterization retentively" action is enabled by default.
4. Click "Load".
The project data are downloaded into the drive.
8.3.6
Saving changes in the project
Overview
Project data that are not saved are lost when closing the project. The entire project must be saved
in order for the settings to take effect permanently.
226
icon in the toolbar.
opens.
This dialog displays alarms and proposes actions necessary for loading.
opens.
Using this dialog, establish an online connection to the required drive.
(https://support.industry.siemens.com/cs/ww/en/view/
SINAMICS S200 PROFINET servo drive system with SIMOTICS S-1FL2
Operating Instructions, 11/2023, FW V6.3, A5E51646752B AB