Rotax 912 i Series Maintenance Manual page 65

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

Fig. 27
1. Lead-through seal
Step
2
Position the stator assy. Then secure 6
M5x30 Allen screws including A 5.5
washers with LOCTITE 243 and tighten
them.
Tightening torque 6 Nm (53 in.lb.).
When positioning, make sure there is as
NOTE:
little spacing possible between the cable
lead-through in the ignition cover and the
cable connection to the coils.
Fig. 28
1. Separation between the two generator coils
2. M5x30 Allen screw
Effectivity: 912 i Series
Edition 1/Rev. 1
BRP-Powertrain
MAINTENANCE MANUAL
2. Adjustment screw M4x8
Procedure
3. Washer A 5.5
Step
3
Install the distance sleeve, disk springs
and washer.
4
Tighten lock nut M5.
Tightening torque 6 Nm (53 in.lb.).
5
Slip on the full length of the black protec-
tion hoses.
Fig. 29
1. Distance sleeve
3. Washer 5.1/15.5/2.5
CONTROLLER CONNECTOR - ASSEMBLY
Step
1
Position the filler plug correctly.
2
Thread the lines through the insulator
(rubber).
3
Make the cable sleeves latch.
When assembling the controller connec-
NOTE:
tor, note the marks made.
Procedure
2. Disk springs 15x5.2x0.7
4. Lock nut M5
Procedure
24-20-00
Page 15
October 01/2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents