Rotax 912 i Series Maintenance Manual page 302

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

ASSEMBLY
IGNITION HOUSING - ASSEMBLY
OIL SEAL - INSTALLATION
Step
1
Lubricate the outside of a new oil seal and
press it into the ignition housing as far as
the bottom with a suitable jig part no.
876510.
Fig. 17
1. Oil seal
WATER PUMP SHAFT - INSTALLATION
Step
1
Lubricate the rotary seal on the inner di-
ameter with LOCTITE 243 and press it
into the insertion jig part no. 877258. Then
press in the water pump shaft as far as it
will go.
2
Insert the pump gear in the ignition hous-
ing.
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
2. Insertion jig
Procedure
Fig. 18
1. Insertion jig
3. Water pump shaft
Step
3
Press the pump shaft with the rotary seal
already compressed into the ignition
housing using the insertion jig part no.
877258.
NOTE:
Ensure that the pump gear is ali-
gned with the pump shaft.
Fig. 19
1. Ignition housing
3. Pump shaft
5. Insertion jig
2. Rotary seal
Procedure
2. Oil seal
4. Rotary seal
75-00-00
Page 14
July 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents