Rotax 912 i Series Maintenance Manual page 319

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

MAINTENANCE
Beside maintenance and special checks, see the
relevant Maintenance Manual Line for the
respective 912 i Series engine type.
REMOVAL
Preparation
Before the ECU is removed, the work and
checks described below must be carried out to
identify any malfunctions and rectify them as
part of the repair work.
- General visual inspection. See section 05-00-
00 and 12-20-00 in the corresponding Mainte-
nance Manual Line for the 912 i Series
engine type.
NOTICE
WARNUNG
The plug connection of the ECU must be open-
ed and closed no more than 20 times!
This must be shown on the device by a clearly
visible sealing with a stamped numerical se-
quence (1-20) and by documentation confor-
ming to self-monitoring guidelines.
CONTROL UNIT - REMOVAL
Step
1
Unplug the couplers ( LANE A1, LANE A2
and LANE B).
-
Press in the lock so that the clamp
can be rotated.
-
Press the clamp down until it latches.
-
Remove the coupler.
Effectivity: 912 i Series
Edition 1/Rev. 1
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
Fig. 4
1. Coupler (LANE A1)
2. Coupler (LANE A2)
3. Coupler (LANE B)
Fig. 5
1. Lock
NOTICE
WARNUNG
Removal must be carried out according to the
aircraft manufacturer's instructions.
Step
2
Remove the battery grounding cable ac-
cording to the aircraft manufacturer's
specifications.
3
Remove the screws according to the air-
craft manufacturer's specifications. Re-
move the ECU.
Procedure
76-10-00
Page 7
October 01/2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents