Introduction
This section describes the system, the removal, installation and inspec-
tion of the fuse box (FUSE BOX) assembly of the ROTAX 912 i Series
engine. The description is divided into sub-sections and explanations of
system functions.
1. Introduction
2. System description
3. Safety information
4. Removal
5. Fuses
6. Installation
7. Finishing work
Effectivity: 912 i Series
Edition 1/Rev. 1
BRP-Powertrain
MAINTENANCE MANUAL
Chapter: 76-10-00
FUSE BOX (FUSE BOX)
Subject
A. Preparation
B. Fuse box - removal
C. Regulator B - removal
D. Regulator A - removal
A. Regulator A - installation
B. Regulator B - installation
C. Fuse box - installation
Page
Page 29
Page 31
Page 31
Page 31
Page 31
Page 31
Page 31
Page 33
Page 33
Page 34
Page 34
Page 35
Page 36
Page 36
76-10-00
Page 29
October 01/2013

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents