Rotax 912 i Series Maintenance Manual page 394

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

INSTALLATION
Preparation
- Clean all parts carefully
- Remove protective coverings
PRESSURE SENSOR (OPS) - INSTALLA-
TION
Step
1
Clean the thread of the pressure sensor.
2
Lubricate the thread of the pressure sen-
sor with LOCTITE 243 and use an
SW 19 open-ended spanner part no.
876075 (or a similar tool) to tighten it.
Tightening torque 15 Nm (88.48 in. lb.).
Fig. 23
1. Pressure sensor (OPS)
Step
3
Plug the respective wiring harness con-
nector into the corresponding pressure
sensor. See section 76-50-00.
4
Attach cable ties (strain relief).
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
Procedure
Fig. 24
1. Pressure sensor (OPS)
PRESSURE SENSOR (MAPS_1/MAPS_2) -
INSTALLATION
Step
1
Clean the thread of the pressure sensor.
2
Tighten the pressure sensor with an SW
21 open-ended spanner part no. 876075
(or similar tool). Tightening torque 15 Nm
(88.48 in. lb.).
3
Plug the respective wiring harness con-
nector into the corresponding pressure
sensor. See section 76-50-00.
4
Attach cable ties (strain relief).
Fig. 25
1. Pressure sensors (MAPS_1/MAPS_2)
2. Cable ties
Procedure
2. Cable ties
76-70-00
Page 24
July 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents