Step
7
Wait until connection state lamps are
"RED".
8
Set "Backup-Battery" and "Master" Switch
to "ON".
Set "LANE A"and "LANE B" Switches to
"ON" (if connection Mode in "Preferences"
Menu set to "LANE A" and "LANE B").
Fig. 19
1. Backup Battery
3. LANE A Switch
Step
9
The connection state (bottom-right corner
of B.U.D.S.) for both LANES should turn
"RED" to "ORANGE" and finally to
"GREEN". See also
Effectivity: 912 i Series
Edition 1/Rev. 1
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
1
2
2. Master Switch
4. LANE B Switch
Procedure
Fig.
20.
3
4
76-10-00
09957
Page 16
October 01/2013