INSTALLATION CHECKLIST
The following installation checklist must be copied and filled in during power plant/engine installation.
Installation checklist for power plant assy./engine 912 iSc
Aircraft
Type
Serial number
Registration number
Manufacturer
Engine
Type
Serial number
FUSE BOX serial number
ECU part no. (S/N)
Manufacturer
Specifications/version
Miscellaneous data
Installation date
Mechanic (surname and forename)
Installation-related point
Control unit (ECU) checked for damage and
corrosion. Insulated construction checked.
Fuse unit (FUSE BOX) checked for damage
and corrosion. Fuses checked.
Fuse unit (FUSE BOX) connections checked for secure
connection.
See also section 71-00-00 Power plant.
Protective coverings removed.
Fuel filters/prefilters on the aircraft frame side cleaned.
All fuel tanks and fuel lines cleaned.
See "Documentation of aircraft manufacturer".
See also section 12-20-00 Planned maintenance.
Checking the engine for contamination and
damage.
See also section 05-00-00 Maintenance.
Installation of the engine and its components.
See also section 71-00-00 Power plant.
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
BRP-Powertrain GmbH&Co KG, 4623 Gunskirchen, Austria
OK
Remark
71-00-00
Page 5
July 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents