Rotax 912 i Series Maintenance Manual page 61

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

INSPECTION
IGNITION HOUSING -
SINGLE PARTS CHECK
Preparation
- Clean all parts carefully. See also section 05-
00-00 Procedures
IGNITION HOUSING - CHECK
Step
1
Carry out visual inspection of sealing sur-
faces.
2
Unscrew pressure sensor (oil). To do this,
see section 76-70-00 Sensors and actua-
tors.
Fig. 18
1. Sealing surface
Step
3
Blow compressed air through the lubrica-
tion bore and check it is clear.
4
Check that the caulked ball is leakproof.
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
Procedure
Fig. 19
1. Lubrication bore
Step
5
Check the sealing surface of the rubber
grommet for striations (especially length-
ways).
Fig. 20
1. Sealing surface for rubber grommet
BEARING BUSHING - CHECK
It is not possible for the bearing bushing
NOTE:
to be replaced, as the inner bore and the
lubrication bore are machined after the
bushing has been pressed.
If the bearing bushing is worn, the entire
ignition cover with the pressed and ma-
chined bushing must be replaced.
Step
1
Check the bearing bushing for damage
and wear.
2
Check that the oil bore is clear.
2. Caulked ball
Procedure
Procedure
24-20-00
Page 11
July 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents