ROLLER BEARING VERSION 3 -
REMOVAL
Preparation
- The propeller gearbox must be removed so
that the roller bearing can be removed.
See section 72-10-00.
- Remove the governor flange.
NOTICE
WARNUNG
The pressing out process for version 3 with the
hydraulic governor is different from that for ver-
sions 2 and 4. The roller bearing is pressed out
together with the oil inlet flange.
See
to
.
Fig. 7
Fig. 8
Step
1
Remove the retaining ring with the circlip
pliers.
2
Put on puller part no. 876489 and push
the hex. screw through the cap, roller
bearing and oil inlet flange.
Fig. 7
1. Retaining ring
Step
3
Install the washer and nut on the rear.
4
The roller bearing is pressed out together
with the oil inlet flange by turning the hex.
screw clockwise.
5
Remove the O-rings.
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
Procedure
Fig. 8
1. Puller part no. 876489
3. Washer
5. Roller bearing
7. O-rings
2. Hex. screw
4. Hex. nut
6. Oil inlet flange