Rotax 912 i Series Maintenance Manual page 164

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

Fig. 35
1. 6x20 dowel pins
NOTICE
WARNUNG
If excessive installation force is used, the
bearing or vacuum pump gear can be damaged.
Step
6
Apply LOCTITE 5910 surface sealing
compound to the sealing surface of the
gearbox housing and place on the gear
cover assy. with the pre-assembled gear-
box.
NOTE:
Move the propeller shaft a little
to allow the dog gear to engage.
7
Tap gently on the gearbox housing with a
soft-faced hammer to position the gear-
box on the crankcase.
NOTE:
If there is a large amount of re-
sistance at a gap of approxi-
mately 10 mm, the bearing rol-
lers of the roller bearing may not
be in position.
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
Fig. 36
1. M8 Allen screw
Step
8
Tighten 2 M8x45 Allen screws and 8
M6x45 Allen screws with washers 6.4 di-
agonally from each other.
Tightening torque M6: 10 Nm (88.5 in.lb.)
Tightening torque M8: 25 Nm (18.4 ft.lb.)
9
Inspect the run-out. See also section 72-
10-00 Wear limits. (GB18)
Finishing work
- Fill with operating fluids or check filling levels.
To do this, see section 12-10-00 Adding
operating fluids.
- Carry out an engine test run. See relevant
Maintenance Manual Line for the 912 i Series
engine type.
- After the engine test run, check the engine
and gearbox for leaks.
2. M6 Allen screw
Procedure
72-10-00
Page 26
July 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents