Rotax 912 i Series Maintenance Manual page 126

Hide thumbs Also See for 912 i Series:
Table of Contents

Advertisement

Fuse box (FUSE BOX)
See section 76-50-00.
Step
1
Loosen M5 hex. nut from the earthing
cable on controller A.
Fig. 6
1. FUSE BOX
3. Controller connector A
5. Controller connector B
Fig. 7
1. Earthing cable
3. Controller connector A
Effectivity: 912 i Series
Edition 1/Rev. 0
BRP-Powertrain
MAINTENANCE MANUAL
Procedure
2. Controller LANE A
4. Controller LANE B
6. Earthing cable harness
2. Controller LANE A
Step
2
Mark the controller connector before
detaching.
3
Push in the tab on the top of the connector
and at the same time pull the connector
out of the connection socket.
Fig. 8
1. Controller connector A
Fig. 9
1. Connection socket
Step
4
Remove the two round connectors
(labelled LANE A, LANE B) of the fuse
box.
NOTE:
Loosen the connector cap
nut anti-clockwise.
5
Pull the connectors in the two grooves out
of the connector socket.
Procedure
2. Controller connector B
2. Controller connector
Procedure
71-00-00
Page 16
July 01/2012

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

912 is912 isc

Table of Contents