6.37.28 Example for Configuring Test Results to Be Sent to the FTP
Server
This part provides examples for sending send test results to the FTP server to save test results
to the most extent.
Networking Requirements
As shown in
results to the FTP server through FTP.
6-232
Configuration file of Switch B
#
sysname SwitchB
#
vlan batch 120 130
#
interface Vlanif120
ip address 10.1.1.2 255.255.255.0
#
interface Vlanif130
ip address 30.1.1.1 255.255.255.0
#
interface GigabitEthernet1/0/0
port hybrid pvid vlan 120
port hybrid untagged vlan 120
#
interface GigabitEthernet2/0/0
port hybrid pvid vlan 130
port hybrid untagged vlan 130
#
ospf 1
area 0.0.0.1
network 10.1.1.0 0.0.0.255
network 30.1.1.0 0.0.0.255
#
return
Configuration file of Switch C
#
sysname SwitchC
#
vlan batch 130
#
interface Vlanif130
ip address 30.1.1.2 255.255.255.0
#
interface GigabitEthernet1/0/0
port hybrid pvid vlan 130
port hybrid untagged vlan 130
#
nqa-server udpecho 30.1.1.2 9000
#
ospf 1
area 0.0.0.1
network 30.1.1.0 0.0.0.255
#
return
Figure
6-30, Switch A serves as the client to perform the ICMP test and send test
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
Issue 03 (2010-09-20)

Advertisement

Table of Contents
loading

Table of Contents