Huawei Quidway S9300 Configuration Manual - Network Management page 525

Terabit routing switch
Hide thumbs Also See for Quidway S9300:
Table of Contents

Advertisement

Quidway S9300 Terabit Routing Switch
Configuration Guide - Network Management
SN
------------------------------------------------------------------------------
2
3
Run the display cluster-license command, and you can check the contents of the cluster license,
including the number of member switches that can be managed by the administrator switch and
maximum layers that member switches can concatenate.
<Quidway> display cluster-license
The max numbers and hops of manage member switch:
-------------------------------------------------------------
Max numbers of manage member switch: 255
Max hops of manage member switch
Run the display cluster-topology-info command, and you can view the cluster topology,
including the topology of normal links, candidate links, and faulty links.
<Quidway> display cluster-topology-info
The topology information about the cluster:
<-->:normal device
-------------------------------------------------------------------------
Total topology node number is 5.
[HUAWEI_0.Administrator: Root-00e0-ad14-c600]
|-(GigabitEthernet1/0/2)<-->(GigabitEthernet1/0/1)[HUAWEI_3.Member-3: 00e0-
da1c-4c00]
| |-(GigabitEthernet1/0/3)<-->(GigabitEthernet1/0/1)[HUAWEI_2.Member-2:
00e0-875b-8f00]
| | |-(GigabitEthernet1/0/0)<-->(GigabitEthernet1/0/0)[HUAWEI_1.Member-1:
00e0-0f68-6f00]
|-(GigabitEthernet1/0/1)<-->(GigabitEthernet1/0/2)[HUAWEI_4.Member-4:
00e0-9f7e-0b00]
Run the display increment-command command, and you can check the incremental
configuration of the cluster, including the number and contents of the incremental configuration.
<Quidway> display increment-command
The content of increment commands:
------------------------------------------------------------------------------
SN
------------------------------------------------------------------------------
10
20
If the configuration files of member switches are successfully synchronized with the FTP server,
run the display increment-synchronization-result command, and you can view that success
is displayed.
<Quidway> display increment-synchronization-result
The result of member switches' synchronization:
------------------------------------------------------------------------------
SN
------------------------------------------------------------------------------
1
2
3
If member switches successfully obtain configuration files, PAF files, or patch files, run the
display member-getfile-stat command, and you can view that success is displayed.
<Quidway> display member-getfile-stat
The status of member switches getting file:
------------------------------------------------------------------------
SN
------------------------------------------------------------------------
Issue 03 (2010-09-20)
Device
MacAddress
S9300
0003-0003-0003 10.0.0.3
S9300
0004-0004-0004 10.0.0.4
Content
vlan batch 10 to 20
ip route-static 2.0.0.0 8 10.0.0.1
Device
MacAddress
S9300
0002-0002-0002 10.0.0.2
S9300
0003-0003-0003 10.0.0.3
S9300
0004-0004-0004 10.0.0.4
Device
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
IpAddress
: 16
<++>:candidate device
IpAddress
MacAddress
IPAddress
8 HGMP Configuration
Result
CommandId
success
-
success
-
<??>:lost device
result
success
success
success
Result
8-29

Advertisement

Table of Contents
loading

Table of Contents