Operation Procedures For The Ladder Monitor Function; Operation Procedures Before Starting Ladder Monitoring - Mitsubishi Electric GOT-A900 Series Operating Manual

Table of Contents

Advertisement

5. OPERATION PROCEDURES FOR THE LADDER MONITOR FUNCTION

Chapter5 Operation procedures for the ladder monitor function
The operation procedures to follow when using the ladder monitor function are
explained in the following section.

5.1 Operation procedures before starting ladder monitoring

This section contains a summary of the procedures for transmitting the system
program (OS) for the ladder monitor function from the personal computer to the GOT
until it is installed in the built-in memory.
For details, please refer to the Help in Drawing Software. Details of the screen display
and key operation are shown in the Help.
Connect GOT to Personal computer.
Start up GOT.
Start up Personal computer to start drawing
software.
With the drawing software, transmit the
system program (OS) for the ladder monitor
function from the Personal computer to the
GOT and install it in the built-in memory.
When installation is finished, the ladder
monitor can be operated through the GOT.
The drawing software operation is finished.
Start
!!!
It is not necessary to set up and operate the GOT
after startup.
!!!
Transmit the data using the installation dialog box.
!!!
When installation is finished, "Completed" is displayed
on the installation dialog box.
!!!
Proceed to Section 5.2 to operate the screen monitor.
End
5 - 1
GOT
MELSEC
5

Advertisement

Table of Contents
loading

Table of Contents