Items To Be Checked Before Starting Drawing - Mitsubishi Electric GT1685 Connection Manual

Got1000 series
Table of Contents

Advertisement

22.3.6 Items to be checked before starting drawing

The following describes that should be understood before starting drawing and the functions that should be set
beforehand when using the multi-channel function.
Device settings
It is necessary to set the device to be used together with the CH No.
GT Designer3 Version
Click the device setting button.
Accessible range for monitoring
The accessible range for monitoring is not changed even when the multi-channel function is used.
3. ACCESS RANGE FOR MONITORING
FXCPU
Screen Design Manual
Click the controller to be set.
22. MULTI-CHANNEL FUNCTION
Set the device.
FXCPU
Accessible range
is not changed.
22.3 GOT Side Settings
17
18
19
20
21
22
23
22 - 39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents