Nortel DMS-100 Manual page 52

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Please confirm: (YES/NO)
3
To confirm the command, type
>YES
and press the Enter key.
RTIF response:
JAM DONE
At the CM reset terminal, ACTIVE or INACTIVE CPU
4
Determine if the computing module (CM) is in sync.
Note: A dot or EccOn under the Sync header means that the CM is in
sync. The word No means that the CM is not in sync.
If the CM
is in sync
is not in sync
5
Determine if the MAP display is available for issuing a drop CPU
synchronization command.
If the MAP display
is available
not available
At the CM reset terminal for the INACTIVE CPU
6
To restart the inactive CPU, type
>\RESTART
and press the Enter key.
RTIF response:
DMS-100 Family NA100 Recovery Procedures LET0015 and up
System level recovery procedures
Booting a DMS switch
DANGER
BOOT command
A CPU mismatch occurs if you use the BOOT command
when the CPUs are InSync. Mismatch handling and
mismatch recovery can change the state of one of both CPUs.
For example, the active CPU can reset the mate CPU during
mismatch handling or recovering. Any in-progress
commands such as BOOT terminate, as a result.
Do
step 5
step 11
Do
step 9
step 6
2-5
(continued)

Advertisement

Table of Contents
loading

Table of Contents