5-68 Emergency power conservation recovery procedures
Emergency power conservation

Restoring a SuperNode ENET to duplex operation

Application
Use this procedure to restore a SuperNode enhanced network (ENET) to
duplex operation. Perform this procedure after you power down one ENET
plane to conserve emergency power.
This procedure assumes that you followed the procedure Emergency power
conservation—Shutdown to take equipment out of service. This procedure
also assumes that all equipment was in normal in-service operation before the
need to perform the emergency power conservation procedure occurred.
Action
The following flowchart is a summary of the procedure. Use the instructions
in the step-action procedure that follow the flowchart to perform the recovery
task.
Note: MAP displays in this procedure are for the 128k ENET. Displays for
the 64k ENET are identical to the 128k ENET display, shelves 2 and 3 are
shown as unequipped (-), as shown in the following example:
Example of a 64k ENET MAP display:
ENET
Plane0Fault .
Plane1
297-8021-545 Standard 14.02 May 2001
SystemMatrixShelf
C . - -
.
.
. .- -
0 1 2 3