Nortel DMS-100 Manual page 422

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Restoring a SuperNode ENET to duplex operation
group if you powered down all plane shelves to conserve emergency power.
Load the shelves separately if the shelves are manual busy for other reasons.
If you want to load
ENET shelves separately
all ENET plane shelves at the
same time
16
To load software into the selected shelf, type
>LOADEN
and press the Enter key.
where
plane_no
is the ENET plane number (0 or 1)
shelf_no
is the ENET shelf number (0 to 7)
MAP response:
WARNING Any software load in the ENET will be destroyed.
Please confirm ("YES" or "NO"):
Load software into the selected plane shelf by typing
17
To confirm the command type
>YES
and press the Enter key.
18
Repeat steps 16 and 17 for each shelf that you powered down to conserve
emergency power. Go to step 20.
19
To load software into all manual busy plane shelves, type
>LOADENALL
and press the Enter key.
20
Determine if you manually busied all ENET plane shelves when you powered
down the shelves to conserve emergency power. Load the shelves as a
group if you powered down all plane shelves to conserve emergency power.
Load the shelves separately if the shelves are manual busy for other reasons.
If you want to return to service
all ENET plane shelves at the
same time
shelves separately
21
To return all manual busy plane shelves on the plane to service, type
>RTS
plane_no
Emergency power conservation recovery procedures
Emergency power conservation
plane_no
shelf_no
NOPROMPT
NOWAIT
ALL
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Do
step 16
step 19
Do
step 21
step 25
5-73
(continued)

Advertisement

Table of Contents
loading

Table of Contents