Nortel DMS-100 Manual page 513

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

5-162 Emergency power conservation recovery procedures
Emergency power conservation
Emergency shutdown of one SuperNode SE CM plane
4
5
6
At the CM reset terminal for the inactive CPU
7
8
297-8021-545 Standard 14.02 May 2001
If
both CPU 0 and CPU 1 have faults
Clear the faults on a minimum of one CPU before you continue this
procedure. To clear the faults on a minimum of one CPU, clear the correct
CM alarms. When a minimum of one CPU is fault free, go to step 2.
To switch activity, type
>SWACT
and press the Enter key.
Example of a MAP response:
Switch of activity will cause the CM to be running on the
inactive CPU's processor clock. System will drop SYNC and
then re–SYNC in order to switch to the active CPU's
clock.
Do you wish to continue?
Please confirm ("YES", "Y", "NO", or "N"):
To confirm the command, type
>YES
and press the Enter key.
WARNING
Loss of service
Make sure that you do not jam the active CPU. A cold
restart will occur if you jam the active CPU while the CM is
out of sync. The word Active on the top banner of the display
identifies the reset terminal for the active CPU.
To jam the inactive CPU, type
>\JAM
and press the Enter key.
RTIF response:
Please confirm: (YES/NO)
To confirm the command, type
>YES
(continued)
Do
step 4

Advertisement

Table of Contents
loading

Table of Contents