Nortel DMS-100 Manual page 195

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

3-28 Node level recovery procedures
Recovering link peripheral processors
56
57
58
59
297-8021-545 Standard 14.02 May 2001
and press the Enter key.
If the response is
Link
link_no:Traffic
is
running
link
Please
("YES","Y","NO",
"N"):
anything else including addi-
tional messages with above re-
sponse
To confirm the command, type
>YES
and press the Enter key.
To load the posted SVR7, type
>LOADPM
and press the Enter key.
If the LOADPM command
passed
failed
To return the SVR7 to service, type
>RTS
and press the Enter key.
If the RTS command
passed, but not all SVR7s in the
posted set are in service
passed and all SVR7s in the
posted set are in service
failed
To display the next SVR7 in the posted set, type
>NEXT
and press the Enter key.
Go to step 57.
(continued)
Do
step 56
on
that
confirm
or
step 85
Do
step 58
step 85
Do
step 59
step 18
step 85

Advertisement

Table of Contents
loading

Table of Contents