Nortel DMS-100 Manual page 515

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

5-164 Emergency power conservation recovery procedures
Emergency power conservation
Emergency shutdown of one SuperNode SE CM plane
13
14
15
297-8021-545 Standard 14.02 May 2001
CPU pair is NOT insync, CUP O is active.
CM is running on active CPU clock
Memory Error Correction is ENABLED.
The inactive CPU is jammed.
If the CM runs
on the inactive clock
on the active clock
To run the CM on the active CPU clock, perform the procedure Switching the
clock source in Card Replacement Procedures . Complete the procedure and
return to this point.
To access the CMMNT level of the MAP display, type
>CMMNT
and press the Enter key.
Example of a MAP display:
CM
Sync
Act
CPU1
0
no
cpu 0
Traps:
Per minute =
AutoLdev:
Primary = SLM 0 DISK Secondary = SLM 1
DISK
Image Restartable = No image test since last restart
Next image restart type = WARM
Last CM REXTST executed
System memory in kbytes as of 14:39:07
Memory(kbytes): Used = 105984 Avail = 12800 Total =
118784
Record the primary autoload device.
Note: The primary autoload device appears on the right side of the
Primary header. The primary autoload device is the disk of SLM 0 in the
example that appears in step 14.
Do
step 13
step 14
CPU1
Jam
Memory
.
.
yes
0
(continued)
CMMnt
MC
.
.
.
Total =
PMC
.
5

Advertisement

Table of Contents
loading

Table of Contents