Nortel DMS-100 Manual page 251

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

4-44 Recovery procedures for individual devices and services
PM TPC
recovery
(continued)
Summary of PM TPC recovery (continued)
PM TPC Recovery
Enter this procedure because of an emergency disruption to service.
1
297-8021-545 Standard 14.02 May 2001
TRNSL on TPC
Post TMS and
post ISG
Determine if
ISG channels
are SB
BSY channel
RTS channel
RTS
successful?
To determine if the TPC has a power outage, check the frame fail light on the
frame supervisory panel (FSP).
2
N
4
Y
N
6
Y
4

Advertisement

Table of Contents
loading

Table of Contents