Nortel DMS-100 Manual page 126

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

Recovering from a dead system in a SuperNode switch
153
Determine from office records or other office personnel the first PM to
recover.
154
To recover the PMs manually and in the required order, perform the correct
alarm clearing procedures in Alarm and Performance Monitoring Procedures .
Completed the procedures and return to this point.
155
To access the DIRP level of the MAP display, type
>IOD;DIRP
and press the Enter key.
156
To determine the state of the recording volumes for the billing subsystem,
type
>QUERY
and press the Enter key.
where
Example input:
>QUERY
Example of a MAP response:
side of the word SER2 in the MAP display. The recovery status can be
pending, in progress, complete, or failed.
If the number of Series I and II
PMs that failed recovery
is zero
is other than listed here
WARNING
Loss of billing data
Depending on your office configuration, billing systems other
than, or in addition to, AMA may be used. Contact your next
level of support to determine if other billing systems are
used, and if recovery action is required.
subsystem
subsystem
is the name of the DIRP subsystem for billing
AMA
ALL
DMS-100 Family NA100 Recovery Procedures LET0015 and up
System level recovery procedures
Do
step 155
step 153
ALL
2-79
(continued)