5-72 Emergency power conservation recovery procedures
Emergency power conservation
Restoring a SuperNode ENET to duplex operation
10
11
12
13
14
15
297-8021-545 Standard 14.02 May 2001
To access the network System level of the MAP display, type
>NET;SYSTEM
and press the Enter key.
Example of a MAP display:
SYSTEM
ShelfPlane 0Plane 1
00 O
01 O
Determine the reason the ENET shelves are offline.
If
you powered down all the
offline ENET plane shelves to
conserve emergency power
any ENET shelves are offline for
reasons other than to conserve
emergency power
To manually busy the first offline plane shelf, type
>BSY
plane_no
shelf_no
and press the Enter key.
where
plane_no
is the ENET plane number (0 or 1)
shelf_no
is the ENET shelf number (0 to 7)
MAP response:
Request to MAN BUSY ENET Plane:0 Shelf:00 submitted.
Request to MAN BUSY ENET Plane:0 Shelf:00 passed.
Repeat step 12 for each plane shelf that you powered down to conserve
emergency power. Go to step 15.
To manually busy all offline shelves, type
>BSY
ALL
OFFL
and press the Enter key.
Determine if you manually busied all ENET plane shelves when you powered
down the shelves to conserve emergency power. Load the shelves as a
(continued)
Do
step 14
step 12