Restoring The Msb7 To Duplex Operation - Nortel DMS-100 Manual

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

5-58 Emergency power conservation recovery procedures
Emergency power conservation

Restoring the MSB7 to duplex operation

Application
Use this procedure to restore the CCS7 message switch and buffer (MSB7) to
duplex operation. Perform this procedure to conserve emergency backup
power after you power down one plane of the MSB7.
The procedure assumes that you followed the Emergency power
conservation—Shutdown procedure in this document to remove equipment
from service. Equipment must be in normal in-service operation before the
need to perform the procedure for emergency power conservation arises.
Action
The procedure contains a flowchart and a list of steps. Use the flowchart to
review the procedure. Follow the steps to perform the procedure.
297-8021-545 Standard 14.02 May 2001

Advertisement

Table of Contents
loading

Table of Contents