5-112 Emergency power conservation recovery procedures
Emergency power conservation
Emergency shutdown of one enhanced network plane
Application
Use this procedure to shut down one plane of the enhanced network (ENET)
to conserve emergency backup power.
Action
The following flowchart is a summary of this procedure. Use the instructions
in the step-action table that follows the flowchart to perform the procedure.
297-8021-545 Standard 14.02 May 2001