2-74 System level recovery procedures
Recovering from a dead system in a SuperNode switch
115
116
117
118
119
120
297-8021-545 Standard 14.02 May 2001
If
any converters do not have power
To power up the frame, perform the Clearing an Ext FSP LPP cabinet major
alarm procedure in Alarm and Performance Monitoring Procedures .
When you complete the procedure, return to this point.
Go to step 111.
Reseat all NT9X74 cards as follows:
a
Carefully slide the card back into the LIS.
b
Push on the upper and lower edges of each faceplate to reseat the card
on the shelf.
c
Close the locking levers on each card.
Repeat steps 108 through 116 for each LPP in your office.
When power returns to all LPPs, proceed to step 118.
To access the SRSTATUS level of the MAP display, type
>SRSTATUS
and press the enter key.
Example of a MAP display:
SRSTATUS
OVERALL STATUS Pend:
0
Quit
VIEW: SYSTEM
2
View_
Pend InPrg
3
List_ MS
0
4
NET
0
5
SER1
0
6
SER2
1
7
SER3
11
8
9
SRSTATUS:
From the MAP display, determine the recovery status of the Series III PMs.
Note: Series III PM recovery status appears to the right side of the word
"SER3" in the MAP display. Recovery status can be one of pending, in
progress, complete, or failed.
If the number of Series III PMs
that fail recovery
is zero
is other than listed here
To recover the PMs manually, perform the Recovering Link Peripheral
Processors procedure in this document.
When the procedure is complete, return to this point.
Do
step 115
18%
InProg: 9%
Comp
Fail
0
2
0
IOD
0
6
0
Other 21
1
6
0
1
60
1
8
30
1
Do
step 121
step 120
(continued)
Comp: 70%
Fail: 3%
11:52:34
Pend
InPrg
Comp
Fail
5
5
30
3
13
2
3