Recovering from a dead system in a SuperNode SE switch
163
164
165
166
right side of the word SER2 in the MAP display. Recovery status can be
pending, in progress, complete, or failed.
If the number of Series I and II
PMs that failed recovery
is zero
is other than zero
Determine from office records or operating company personnel the PMs to
manually recover first.
Perform the procedures in Alarm and Performance Monitoring Procedures.
to manually recover the PMs in the required order. Complete the procedures
and return to this point.
CAUTION
Loss of billing data
Office configuration can allow the system to use billing
systems other than, or in addition to, AMA. Contact the next
level of support to determine if other billing systems are in
use. Determine if the system requires recovery action.
To access the DIRP level of the MAP display, type
>IOD;DIRP
and press the Enter key.
To determine the state of the recording volumes for the billing subsystem,
type
>QUERY
subsystem
and press the Enter key.
where
subsystem
is the name of the DIRP subsystem used for billing.
Example input:
>QUERY
AMA
ALL
Example of a MAP response:
DMS-100 Family NA100 Recovery Procedures LET0015 and up
System level recovery procedures
Do
step 165
step 163
ALL
2-113
(continued)