Application
Use this procedure to conserve emergency backup power. To conserve
emergency backup power, shut down one computing module (CM) plane.
Action
The following flowchart is a summary of the procedure. Use the instructions
in the step-action procedure that follows the flowchart to perform the recovery
task.
Emergency power conservation recovery procedures 5-159
Emergency shutdown of one SuperNode SE CM plane
DMS-100 Family NA100 Recovery Procedures LET0015 and up
Emergency power conservation