Nortel DMS-100 Manual page 159

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

2-112 System level recovery procedures
Recovering from a dead system in a SuperNode SE switch
157
158
159
160
At the MAP terminal
161
162
297-8021-545 Standard 14.02 May 2001
If the converters
did not power up
Determine if all PM frames powered up.
If all frames
powered up
did not power up
Determine if an attempt to power up the frames that remained occurred.
If an attempt to power up the
frames that remain
did not occur
occurred and failed
Power up the next frame.
Go to step 148.
Power up the PM frames that remain. Perform the correct procedures in
Alarm and Performance Monitoring Procedures. Complete the procedure
and return to this point.
To access the SRSTATUS level of the MAP display, type
>SRSTATUS
and press the Enter key.
Example of a MAP display:
SRSTATUS
OVERALL STATUS Pend:
0
Quit
VIEW: SYSTEM
2
View_
Pend InPrg
3
List_ MS
0
4
NET
0
5
SER1
0
6
SER2
1
7
SER3
11
8
9
SRSTATUS:
From the MAP display, determine the recovery status of the Series I and II
PMs.
Note: Series I PM recovery status appears on the right side of the word
SER1 in the MAP display. Series II PM recovery status appears on the
Do
step 158
Do
step 161
step 158
Do
step 159
step 160
18%
InProg: 9%
Comp
Fail
0
2
0
IOD
0
6
0
Other 21
1
6
0
1
60
1
8
30
1
(continued)
Comp: 70%
Fail: 3%
11:52:34
Pend
InPrg
Comp
Fail
5
5
30
3
13
2
3

Advertisement

Table of Contents
loading

Table of Contents