Nortel DMS-100 Manual page 125

Hide thumbs Also See for DMS-100:
Table of Contents

Advertisement

2-78 System level recovery procedures
Recovering from a dead system in a SuperNode switch
147
148
149
150
At the MAP terminal
151
152
297-8021-545 Standard 14.02 May 2001
If
any of the converters do not
have power
Determine if all PM frames have power.
If
all frames have power
any frames do not have power
Determine if an attempt to restore power to the remaining frames occurred.
If an attempt to restore power to
the remaining frames
did not occur
failed
Power up the next frame.
Go to step 138.
To power up the PM frames that remain, perform the correct procedures in
Alarm and Performance Monitoring Procedures . Complete the procedure
and return to this point.
To access the SRSTATUS level of the MAP display, type
>SRSTATUS
and press the enter key.
Example of a MAP display:
SRSTATUS
OVERALL STATUS Pend:
0
Quit
VIEW: SYSTEM
2
View_
Pend InPrg
3
List_ MS
0
4
NET
0
5
SER1
0
6
SER2
1
7
SER3
11
8
9
SRSTATUS:
From the MAP display, determine the recovery status of the Series I and II
PMs.
Note: Series I PM recovery status appears to the right side of the word
SER1 in the MAP display, Series II PM recovery status appears to the right
Do
step 148
Do
step 151
step 148
Do
step 149
step 150
18%
InProg: 9%
Comp
Fail
0
2
0
IOD
0
6
0
Other 21
1
6
0
1
60
1
8
30
1
(continued)
Comp: 70%
Fail: 3%
11:52:34
Pend
InPrg
Comp
Fail
5
5
30
3
13
2
3

Advertisement

Table of Contents
loading

Table of Contents